4 Way Mains Power Board with 3m Long Lead
4 Way Powerboard for the home or office
SKU: PB5185
$21.95
RRP $43.95
In Stock
4 Way Mains Power Board with 3m Long Lead
4 Way Powerboard for the home or office
10A Circuit Breaker
Surge protection
Master Power Switch
Right-Angle Plug
Extra-long 3 metre cord
| SKU | PB5185 |
| Barcode # | 9351634069187 |
| Brand | Aus Electronics Direct |
| Shipping Weight | 0.5400kg |
| Shipping Width | 0.160m |
| Shipping Height | 0.065m |
| Shipping Length | 0.350m |
| Shipping Cubic | 0.003640000m3 |
| Unit Of Measure | ea |
Be The First To Review This Product!
Help other Aus Electronics Direct users shop smarter by writing reviews for products you have purchased.